当前位置:首页 > 搅拌车资讯 > 常见问题操作混凝土全自动搅拌车的七大注意事项
操作混凝土全自动搅拌车的七大注意事项
来源:http://www.cnzkjf.cn发布日期:2023-06-09   浏览量:0
 
一、自动上料搅拌车应停在平地上,并将铲斗平放在地面上。当发动机熄火后,需反复多次扳动工作装置操纵手柄,确保各液压缸处于无压休息状态。如果自动上料搅拌车只能停在坡道上时,要将轮胎垫牢。
1、 The automatic feeding mixer truck should be parked on flat ground and the bucket should be placed flat on the ground. After the engine shuts down, it is necessary to repeatedly pull the operating handle of the working device multiple times to ensure that each hydraulic cylinder is in a pressure free rest state. If the automatic feeding mixer truck can only park on a slope, the tires should be securely padded.
二、混凝土全自动搅拌车装料前,应先排净搅拌罐内残存的积水和杂物。在运输过程中要不停的转动,以防混凝土离析。混凝土全自动搅拌车到达工地和卸料之前,应先使搅拌罐以每分钟14—18转的速度转1—2分钟,然后再进行反转卸料。反转之前,应使搅拌罐停稳不转。
2、 Before loading the fully automatic concrete mixer truck, the remaining water and debris in the mixing tank should be drained first. Continuously rotate during transportation to prevent concrete segregation. Before the fully automatic concrete mixer truck arrives at the construction site and unloads materials, the mixing tank should be rotated at a speed of 14-18 revolutions per minute for 1-2 minutes before reverse unloading. Before reversing, the mixing tank should be kept stationary.
三、环境温度如果高于25摄氏度,从装料、运输、到卸料的延续时间不得超过60分钟;如果环境温度低于25摄氏度,上述时间不得超过90分钟。
3、 If the ambient temperature is above 25 degrees Celsius, the duration from loading, transportation, to unloading shall not exceed 60 minutes; If the ambient temperature is below 25 degrees Celsius, the above time should not exceed 90 minutes.
四、在施工现场卸料完毕后,应立即用混凝土全自动搅拌车随车带的软管冲洗进料斗、出料斗、卸料溜槽等处,粘附在车身各处的污泥及混凝土。在返回搅拌站的途中,应向搅拌罐内注150L—200L的水来清洗搅拌罐壁及叶片粘结的混凝土残渣。
4、 After the unloading at the construction site is completed, the inlet hopper, outlet hopper, discharge chute, and other areas should be immediately flushed with the hose attached to the fully automatic concrete mixer truck to remove sludge and concrete adhering to the vehicle body. On the way back to the mixing plant, 150L-200L of water should be injected into the mixing tank to clean the concrete residue adhered to the mixing tank wall and blades.
混凝土全自动搅拌车
五、每天工作结束后,司机应负责向搅拌罐内注入清水并以每分钟14—18转的速度旋转5—10分钟,然后将水排去,以保障搅拌罐内清洁。用高压水清洗搅拌罐各个部分时,应注意避开仪表及操纵杆等部位。
5、 After the end of each day's work, the driver should be responsible for injecting clean water into the mixing tank and rotating it at a speed of 14-18 revolutions per minute for 5-10 minutes, then draining the water to ensure cleanliness inside the mixing tank. When cleaning various parts of the mixing tank with high-pressure water, attention should be paid to avoiding parts such as instruments and control rods.
六、搅拌罐内外残存的混凝土渣块时,以及在机修人员进入搅拌罐内进行检修和焊补作业时,需先关闭搅拌车发动机,使搅拌罐完全停止转动。在机修人员进入搅拌罐内的工作期间,需要保障搅拌罐内通风良好,无可燃气体及有害灰尘。在搅拌罐内使用电动工具操作时,操作人员需要有良好的绝缘保护。
6、 When removing residual concrete debris inside and outside the mixing tank, as well as when mechanical maintenance personnel enter the mixing tank for maintenance and welding operations, the mixer truck engine must be turned off first to completely stop the mixing tank from rotating. During the work period when mechanical maintenance personnel enter the mixing tank, it is necessary to ensure that the tank is well ventilated and free from combustible gases and harmful dust. When using electric tools in the mixing tank, operators need to have good insulation protection.
七、混凝土全自动搅拌车工作时,不得将手伸入旋转的搅拌罐内,严禁将手伸入主卸料溜槽和加长卸料溜槽的连接部位,以免发生事故。更多相关的事项就来我们网站http://www.cnzkjf.cn咨询吧!
7、 When the fully automatic concrete mixer truck is working, it is not allowed to reach into the rotating mixing tank, and it is strictly prohibited to reach into the connection part of the main discharge chute and the extended discharge chute to avoid accidents. For more related matters, come to our website http://www.cnzkjf.cn Consult!

莱州中科聚峰机械有限公司 电话:15053524111 地址:山东省莱州市206国道与308省道交叉口东南50米